HTD 8M-85 Timing Pulley
8M Kurvenwellen-Synchronriemenscheibe, Serie 8M-85. Zähnezahl, Riemenbreite und Wellenanschluss aus der Katalogtabelle oder der genehmigten Zeichnung auswählen.
HTD 8M-85 Timing Pulley Configuration Overview
8M-85 HTD Timing Pulley is a 8 mm pitch synchronous pulley family with a nominal belt-face reference of 85 in the catalogue naming system. This page treats the series as a configurable industrial component rather than a single fixed SKU. Tooth count changes pulley diameter and may also change hub, flange, material or mounting details, so the order must be tied to a specific catalogue row or an approved drawing.
For procurement, begin with the complete belt designation and confirm that the mating belt uses the same HTD 8M profile. Pitch alone is not a safe interchange rule for every curvilinear belt family. After profile confirmation, select tooth count and working width, then review the shaft interface, hub projection, flange arrangement and available material. This sequence reduces the common replacement error of matching only outside diameter while overlooking the tooth system or mounting geometry.
The straight-bore construction shown for this family is intended for positive synchronous power transmission. Typical enquiries come from machine tools, conveyors and higher-duty industrial motion. Actual suitability depends on speed, transmitted load, center distance, belt construction, alignment, environment and shaft support. Those duty inputs should be supplied for a new drive or when an existing machine has recurring belt-tracking or wear problems.
8M-85 Construction and Shaft Interface
8M-85 belongs to the 8M HTD family and this page covers straight-bore construction. The catalogue table on this page spans 22–112 teeth. Construction codes visible in the table include 2F, 7F, 8. Use the exact product code with the tooth count because the hub/flange arrangement can change inside one width series.
Der Breitencode 85 Diese Katalogbezeichnung kennzeichnet eine Produktfamilie; sie ersetzt jedoch nicht die Überprüfung der Kennzeichnung des Gegenriemens und der Maßzeichnung. Bei Austauscharbeiten muss die vorhandene Riemenlinie erhalten und die Geometrie der Wellenseite vermessen werden, bevor entschieden wird, dass eine Riemenreihe mit den korrekten Zähnen als mechanischer Ersatz geeignet ist.

Read the 8M-85 Dimension View Before the Table
Die Bemaßungsansicht erläutert, wie Symbole wie Dp, De, Df, Dm, Di, F, L und Bohrungsfelder mit der Konstruktionszeichnung zusammenhängen. Verwenden Sie die Zeichnung und die gleiche Produktzeile gemeinsam; übertragen Sie keine Bemaßung von einem anderen Konstruktionstyp, nur weil Teilung und Zähnezahl übereinstimmen.
For 8M-85, record the values that control installation—working face, hub projection, flange envelope and shaft connection—against a stable machine datum. If a finished bore, keyway or tolerance is not defined by the catalogue row, add it on the RFQ or controlled drawing instead of assuming a universal value.

8M-85 Technical Specification Table
Die folgenden Werte stammen aus dem Katalog der ausgewählten Zahnriemenscheiben dieser Baureihe. Bitte geben Sie bei Ihrer Angebotsanfrage die Artikelnummer und die Zähnezahl an. Die Abmessungen entsprechen den Katalogwerten; die endgültige Wellenpassung, die Keilnut, die Oberflächenbeschaffenheit und die Prüfanforderungen sind in der Angebotsanfrage oder der Zeichnung anzugeben.
| Code | Typ | Zähne | Dp | De | Df | Dm | Di | F | L | D | Flansch | Ca. kg |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 22-8M-85 | 2F | 22 | 56,02 | 54,65 | 60 | 43 | – | 95 | 105 | 12 | 308 | 1,60 |
| 24-8M-85 | 2F | 24 | 61,11 | 59,74 | 66 | 45 | – | 95 | 105 | 12 | 310 | 1,95 |
| 26-8M-85 | 2F | 26 | 66,21 | 64,84 | 71 | 48 | – | 95 | 105 | 12 | 311 | 2,30 |
| 28-8M-85 | 2F | 28 | 71,30 | 70,08 | 75 | 50 | – | 95 | 105 | 14 | 312 | 2,60 |
| 30-8M-85 | 2F | 30 | 76,39 | 75,13 | 83 | 55 | – | 95 | 105 | 14 | 314 | 3,10 |
| 32-8M-85 | 2F | 32 | 81,49 | 80,16 | 87 | 60 | – | 95 | 105 | 14 | 315 | 3,70 |
| 34-8M-85 | 2F | 34 | 86,58 | 85,21 | 91 | 66 | – | 95 | 105 | 14 | 316 | 4,00 |
| 36-8M-85 | 2F | 36 | 91,67 | 90,30 | 98,5 | 70 | – | 95 | 105 | 14 | 319 | 4,70 |
| 38-8M-85 | 2F | 38 | 96,77 | 95,39 | 103 | 75 | – | 95 | 105 | 14 | 320 | 5,10 |
| 40-8M-85 | 2F | 40 | 101,86 | 100,49 | 106 | 75 | – | 95 | 105 | 14 | 321 | 5,40 |
| 44-8M-85 | 2F | 44 | 112,05 | 110,67 | 119 | 75 | – | 95 | 105 | 14 | 325 | 6,70 |
| 48-8M-85 | 2F | 48 | 122,23 | 120,86 | 127 | 75 | – | 95 | 105 | 14 | 327 | 7,20 |
| 56-8M-85 | 2F | 56 | 142,60 | 141,23 | 148 | 80 | – | 95 | 105 | 18 | 333 | 11,48 |
| 64-8M-85 | 7F | 64 | 162,97 | 161,60 | 168 | 100 | 137 | 95 | 95 | 18 | 338 | 11,02 |
| 72-8M-85 | 7F | 72 | 183,35 | 181,97 | 192 | 110 | 158 | 95 | 95 | 18 | 340 | 13,45 |
| 80-8M-85 | 8 | 80 | 203,72 | 202,35 | – | 110 | 180 | 95 | 95 | 20 | – | 12,36 |
| 90-8M-85 | 8 | 90 | 229,18 | 227,81 | – | 110 | 204 | 95 | 95 | 20 | – | 14,38 |
| 112-8M-85 | 8 | 112 | 285,21 | 283,83 | – | 110 | 254 | 95 | 95 | 24 | – | 18,66 |
Where the 8M-85 Family Fits
8M-85 is part of the 8M family used for industrial synchronous drives where tooth count, construction type, bore or bush and axial installation space should be reviewed together. Application suitability is not determined by pitch alone. A new drive still needs the required speed relationship, load or torque basis, center distance, environment and service conditions before the pulley row can be finalized.
Für einen Austausch ist es am sichersten, mit der vorhandenen Riemen-/Profilkennung und der ursprünglichen Zähnezahl zu beginnen. Eine Änderung der Zähnezahl verändert den Teilkreisdurchmesser und das Übersetzungsverhältnis, während eine Änderung der Befestigungskonstruktion die Riemenführung verändern oder den Ausbau erschweren kann.

Material and Construction Choices for 8M-85
Use the material and construction shown for the exact 8M-85 product code or approved drawing. Do not identify pulley material from color, surface appearance or a photograph. Where a project requests a different material, finish, hub, flange or shaft feature, treat that as a custom requirement and review its effect on dimensions and inspection before quotation.
Within the 22–112 teeth range, construction codes can vary. That variation is why the product code, tooth count and construction view should remain together in the order record.

Installation Checks for 8M-85
Before installation, compare the new pulley with the released 8M-85 row or drawing. Verify the shaft connection, axial position, flange condition and belt line before tension is applied. The belt should enter the pulley without being forced sideways by a misaligned shaft, displaced hub or incorrect spacer arrangement.
Prüfen Sie nach der Montage die für die Maschine relevanten Merkmale – sichere Befestigung, Ausrichtung, freie Drehung, Riemenlauf sowie alle in der Zeichnung vorgegebenen Rundlauf- oder Axialabweichungen. Wenden Sie keine allgemeine Toleranz an, wenn die Geräte- oder Auftragszeichnung abweichende Anforderungen definiert.

Bestellung, Muster und Geschäftsplanung
Die Mindestmengen richten sich nach Produkttyp, Fertigungsweg und Gesamtbestellwert. Für Standardkatalogteile gelten in der Regel Mindestbestellmengen.
Neukunden können 1–5 Musterstücke anfordern, sofern Konfiguration und Produktionsablauf passen. Muster werden separat angeboten.
Verschiedene Riemenscheibenmodelle können kombiniert werden. Ein Gesamtbestellwert von etwa 1.500 USD ist der übliche Planungspunkt für Bestellungen mit gemischten Modellen.
Mengen von ein oder zwei Stück können nur zur technischen Validierung oder zur Anforderung eines qualifizierten bezahlten Musters, nicht aber als Einzelhandelsbestellungen, berücksichtigt werden; der Stückpreis ist entsprechend höher.
Standardteile: in der Regel 10–25 Werktage. Kundenspezifische Komponenten: in der Regel 20–45 Werktage. Projektbezogene Baugruppen oder zugehörige Ausrüstung: 45–120 Werktage (sofern zutreffend). Die endgültige Lieferzeit wird nach Prüfung der Zeichnung, des Materials und der Menge bestätigt.
EXW, FOB, CIF und DAP sind gängige Lieferbedingungen. FCA, CFR, CPT, CIP und DDP können für geeignete Sendungen und Bestimmungsorte individuell vereinbart werden.
How to Prepare an RFQ for 8M-85
Senden Sie bitte die vollständigen Angaben zu Riemenmarkierung, benötigter Zähnezahl, Riemenbreite, Wellendurchmesser und Passung, Montageart, Menge und Bestimmungsort. Fügen Sie eine bemaßte Zeichnung oder aussagekräftige Fotos der Ersatzriemenscheibe hinzu, wenn Nabenüberstand, Flanschgeometrie, Keilnut, Oberflächenbeschaffenheit oder Prüfgrenzen nicht dem Standard entsprechen. Wenn Sie eine veraltete Riemenscheibe ersetzen, geben Sie bitte die Maße für Vorder-, Rück- und Seitenfläche an, anstatt sich nur auf den Außendurchmesser zu verlassen.
Vergleichen Sie bei ähnlichen Entscheidungen die 8M product family, überprüfen Sie die HTD-Riemenscheiben-Auswahlhilfeoder siehe Anwendungsleitfaden aus maschinenspezifischen Gründen.
8M-85 Frequently Asked Questions
Is every 8M-85 pulley interchangeable?
Nein. Die Baureihenbezeichnung schränkt die Bandbreite und Breite ein, Zähnezahl, Bauart, Bohrung oder Buchse, Nabenabmessungen, Flanschanordnung und Material können jedoch variieren. Bitte prüfen Sie die genaue Katalogzeile oder Zeichnung.
Können Sie anhand einer vorhandenen Riemenscheibe ein Angebot erstellen?
Ja, sofern die Ersatzteilinformationen ausreichend sind. Bitte senden Sie die Riemenmarkierung, die Zähnezahl, die Zahnbreite, die Wellendetails und die Maße beider Seiten. Bei Sondergeometrien ist eine Zeichnung hilfreich.
Sind auch kleinere Mengen lieferbar?
Für eine qualifizierte technische Validierung können kleine, kostenpflichtige Muster in Betracht gezogen werden. Der übliche Vertriebsweg ist die Belieferung der Industrieproduktion und nicht der Einzelhandelskauf von ein oder zwei Stück.
Welche Dokumente sollten mit der Bestellung angefordert werden?
Die vom Staat geforderten Maßprüfungen, Materialdokumentationen, Kennzeichnungen oder auftragsspezifischen Konformitätsnachweise müssen bereits in der Angebotsanfragephase vorliegen, damit Verfügbarkeit und Umfang vor Produktionsbeginn bestätigt werden können.